– Treating concrete ceilings without plastering and preparing them for painting.
– Supply and installation of an Asib type workshop with an area of 27,000 square meters (including basement ceilings)
– Supply and installation of Jotun paints for walls and corridors with an area of 25,000 square meters
projectSamim ToweradministrationAdwa Al-Azhariya Contracting Est
Connect with us
Connect with us
لا تعليق