1- Quarrying and sanding the plaster with stone and mesh until the wall surface becomes smooth and free of any cement excess.
2_ Paint 1 meter of chemical moisture insulation primer under the wall to prevent moisture from reaching the walls from the tiles.
3-Lightening and treating cracks in plaster.
4- Paint 1 meter of chemical moisture insulation primer under the wall to prevent moisture from reaching the walls from the tiles.
5- Paint a primer on the walls to give the putty strength and adhesion after installation.
6- Install two Vetonite putty knives, the first in a longitudinal direction and the second in a horizontal direction, until the walls are leveled and plastering defects are addressed, if any.
7- Paint a primer surface until the vetonite paste is isolated and the surface is cleaned of sanding dust for the next stage.
8- Install two putty knives ready to ensure the walls are completely level.
9- Sand the walls well with a flashlight on until any excesses are removed and the surface is completely leveled until it is ready for painting.
10-Installing the face of the lining paint mechanically or manually.
11- Installation of two final finishing coats of paint according to the approved color